China Steel Corporation No.84, 85 Finished Goods Warehouse Civil Engineering Foundation
     
Location
China Steel Factory Area
Client
China Steel (V8)
Construction Period
92.11~93.09
Purpose
Electrical control room
Construction Amount
NT$65 million
Floor Area
15,000m2
Structure
Reinforced concrete
Construction Method
Open excavation PC pile
 
 
 
 