HomeProjectsFactory ConstructionsIndustrial Factories
 
     
China Steel first, second stage coke plant coal warehouse addition civil engineering
     
Location
China Steel Factory Area
Designer
Japan (OTTO CORPORATION)
Construction Period
90.09~92.05
Construction Amount
Approximately NT$60 million
Floor Area
1,200m2
Structure
RC structure (body) + steel structure pipe rack
Construction Method
Guid pile and horizontal boards method + Mat foundation
Building tall
Approximately 62m
 
 
 
 
United Steel Engineering & Construction Corp. Copyright (C) 2008 *Best Viewed with 1024*768
No.1, Jhonggang Rd., Siaogang District, Kaohsiung City Tel:(07)806-2555 Fax:(07)802-2177
10F., No.58, Sec. 3, Mincyuan E. Rd., Jhongshan District, Taipei, Taiwan  Tel: (02) 2517-3611 Fax: (02) 2517-1965